How a project actually runs
From the first walkthrough to the last styled shelf — the sequence we follow, what it costs in time, and where clients are needed most.
Interiors go wrong in the calendar more often than in the drawing. This is the sequence we use on every home and workplace, and the points at which your time — not ours — is what keeps the project moving.
The first visit
We walk the space before we talk about style. Ceiling heights, service shafts, the direction of light, what the building will and will not allow. By the end of that visit we can usually say what is possible, what is expensive, and what we would not do at all.
- 01A floor plan from the builder, even a rough one.
- 02The pieces you intend to keep, photographed.
- 03A budget range you are comfortable saying out loud.
- 04The date you need to move in — the real one.
Drawings and decisions
Layouts come first, then joinery, then finishes. We hold material decisions until the plan is settled, because a palette chosen against the wrong layout has to be chosen twice. Expect four to six weeks here on an apartment; this is the stage where care is cheapest.
“Every hour spent on the drawing is an hour not spent undoing something on site.”

On site
We visit weekly and share a short written update after each visit. Changes are welcome until the joinery is cut; after that, they are costly and we will say so plainly. Most delays come from a single undecided item — usually stone, sometimes a light fitting shipped from abroad.
Handover
The last two weeks are styling and snagging: alignment, switch plates, the height of every shelf, the way a door closes. We hand over a maintenance note for each finish, because a good material treated badly ages faster than a poor one treated well.